Limited time offer

Get 25% off your order

Use the code below at checkout β€” offer expires soon.

Your promo codeBESTW25
25%
Expires in: 10:00
Claim my 25% discount

πŸŽ“ Get 20% off your first order! Use code FIRST20 at checkout. Order Now →

Home β€Ί Uncategorized β€Ί Security Zoning & Mitigation Assignment: Jurong East International School Case Study on Protection-in-Depth for Medium-High Risk Campus

Security Zoning & Mitigation Assignment: Jurong East International School Case Study on Protection-in-Depth for Medium-High Risk Campus

Subject Uncategorized
Delivery From 3 Hours
Quality 100% Original
Status βœ“ Available

International School Security Planning – Jurong East

1. Project Overview

An International School (IS) has been proposed at Jurong East, a 10-minute walk from Jurong East MRT station. The IS consists of 2 four (4) storey buildings. Children of key appointment holders (from overseas countries) are enrolled in this school.

2. Campus Site Details and Provisions

General Site Features:

  1. 2.4m welded mesh fence line around the campus.
  2. A Guard House is proposed at the entrance of the Main Vehicular Gate.
  3. Vehicular barrier (IN/OUT) provided at Main Vehicular Gate entrance.
  4. A pedestrian Turnstile is proposed next to the Main Vehicular Gate for Staff Access.
  5. The building is designed with fixed glass faΓ§ade with no openable windows.
  6. Staff and Public parking space is provided within the Campus.
  7. At the front of the building is the main road, entry to the IS.
  8. At the back of the building is an open field with 3m trees – 2m away from the fence line.
  9. On the right and left side of the fence line are canals (5m width & 2m depth).
  10. All visitors are required to register at the Guard House prior to entry into the Campus.
  11. The operating hours of the IS are:
    • 0630 hrs till 2000 hrs (Monday to Friday)
    • 0900 hrs till 1300 hrs on Saturdays
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments

Order Now


Building Space Allocation:

Building 1

Basement

  1. Aircon, Mechanical & Electrical, IT, Generator and UPS rooms.
  2. Roller shutter at the Basement Entrance
  3. Vehicular Drop Arm Barrier at Basement Entrance

1st Storey

  1. Main Lobby Reception Counter
  2. Lift (2 nos)
  3. Principal and Teachers room
  4. Meeting rooms (4 nos)
  5. Function room (1 no)
  6. Lecture Theatre (2 nos)
  7. Security Control Room (consisting of security equipment)
  8. Two (2) Staircases and exit staircase doors

2nd Storey

  1. Lecture rooms
  2. Music room consisting of musical instruments
  3. Sports Room consisting of Sports equipment
  4. Assembly Hall

3rd Storey

  1. Lecture rooms

4th Storey

  1. Library
  2. Computer Lab consisting of computers used by students
  3. Server room & LAN room
Building 2

1st Storey

  1. Main Lobby with 2 Lifts
  2. Two (2) Staircases and exit staircase doors
  3. Commercial shops and eateries
  4. Lecture Theatres (2 nos)
  5. Book Shop
  6. Cafeteria

2nd Storey to 4th Storey

  1. Lecture rooms

Roof Garden

  1. Barbecue Pits
Buy Custom Answer of This Assessment & Raise Your Grades

Order Now


3. Security Risk Assessment

A risk assessment has already been conducted and a security risk level of Medium to High has been identified. Security mitigation measures should be based on the following threats:

Identified Threats:

Internal Threats:
  • Theft
  • Vandalism
  • Sabotage
  • Arson
  • Theft of confidential information
External Threats:
  • Intrusion
  • Theft
  • Vandalism
  • Sabotage
  • Arson
  • Theft of confidential information
  • Vehicle Ramming
  • Kidnapping
  • Armed Assailant

4. Project Requirements

The project requires the student to prepare the following:

  1. Concept Plan proposing the security zoning and security measures (physical & electronic) for the new international school campus, based on the protection in depth approach.

5. Project Report Format

  1. Introduction
  2. Risk Assessment – summary based on the information provided
  3. Concept Plan (based on the protection in depth approach)
    1. Adjacent/Perimeter Protection
    2. Building Perimeter Protection
    3. Space and Area Protection
    4. Asset Protection
  4. Recommend security measures (physical & electronic measures)
  5. Conclusion
Stuck with a lot of homework assignments and feeling stressed ?
Take professional academic assistance & Get 100% Plagiarism free papers

Buy Now


The post Security Zoning & Mitigation Assignment: Jurong East International School Case Study on Protection-in-Depth for Medium-High Risk Campus appeared first on My Assignment Help SG.

πŸ“ Need Help With a Similar Assignment?

Our expert writers can deliver a 100% original, plagiarism-free paper tailored to your requirements with fast turnaround.

Get Professional Help Now →
WhatsApp
Limited Offer Get 25% off β€” use code BESTW25
No AI No Plagiarism On-Time Delivery Free Revisions
Claim Now